Future Projects

  • 5 Intersections (HSIP)

    Highway Safety Improvement Program (HSIP) project. 5 intersections in Tehama County: South Avenue and Rowles Road, South Avenue and Marguerite Avenue, South Avenue and Woodson Avenue, Finnell Avenue and 99W, and Capay Road and 99W. Install splitter-islands on minor road approaches, remove current pavement markings and upgrade intersection pavement markings including a slurry seal, and install flashing beacons as advanced warning on major road approaches. Estimated advertising date:  August 2022 Estimated completion date:  Fall 2022 View Vicinity Map as PDF

  • In Tehama from Gyle Road intersection of 99W (formerly old SR 99) and extends north to Red Bluff ending at I-5 overcrossing. Resurfacing and reconfigure pavement delineation/reflective markers, signal improvements and intersection improvement at I-5 interchange. Estimated advertising date: Spring 2023 Estimated completion date: Fall 2024

  • 99W Gap Closure

    Approximately 7 miles of improvements within the R/W on South 99W from the Glenn County line to the Corning City limit. Pavement rehabilitation includes Cold-in-Place Recycling and a Hot Mix overlay to existing grade. The project also updates pavement delineation and reflective markers. Estimated advertising date: Winter 2024/2025 Estimated completion date: Fall 2025

  • Storm damage occurred at the Squaw Hollow Creek Bridge in February 2019 during the Governor-declared emergency. Tehama County bridge crew performed emergency repairs only on the eroded portion of the roadway at the bridge. The rest of the damage to the creek and bridge will be repaired and maintained in the coming year to prevent erosion and flooding. Estimated completion date: 2024

  • Construction of Evergreen Road Bridge Replacement over the South Fork Cottonwood Creek. The project consists of replacing the deficient structure, adding turn lanes on Bowman Road to access Evergreen Road, and replacing an Anderson Cottonwood Irrigation District (ACID) crossing. Estimated advertising date: Fall 2022 Estimated completion date: Fall 2024

  • Highway Safety Improvement Program (HSIP) project. Two (2) intersections on Gallagher Avenue: the intersection of Gallagher Avenue and Houghton Avenue, and the intersection of Gallagher Avenue and Edith Avenue. Install flashing beacons as advanced warning, convert to all way stop control (from 2-way or yield control), and install transverse rumble strips on major road approaches. Estimated advertising date: August 2022 Estimated completion date: Fall 2022 View Vicinity Map as PDF

  • Two bridge replacements on Kirkwood Road at Jewett Creek and on Columbia Avenue at Jewett Creek in Corning, CA. These projects will be combined under one construction contract. Estimated advertising date: Winter of 2022/2023 Estimated completion date: Fall 2023

  • Highway Safety Improvement Program (HSIP) project. A 3.5 mile segment of Lake California Drive in Cottonwood, CA from 0.25 mile south of Main Street to Sawtooth Drive. Improve segment with curve treatments, edge of pavement treatment, and clearing. Estimated advertising date: Winter 2024/2025 Estimated completion date:  2025 View Vicinity Map as PDF  

  • Construction of a new bridge in replacement of a low water crossing on McCoy Road at North Fork Dibble Creek. Project includes re-alignment of approximately 2,500’ of McCoy Road and constructs an intersection with Matlock Loop for approximately 600’. Estimated advertising date: Spring 2024 Estimated completion date: 2026

  • A new roadway – approximately 1000 feet in length – along the south side of the existing alignment between Moon Shadow Ranch Road and Johnson Road shall be constructed to make it safer for travelers and prevent further erosion near Liza Creek. Estimated completion date: 2023